We already translate it as a factory-examination that in fact is a combination of the activities of both operational and managerial, which includes surveys, data collection, check, measure, detection, examination, analyze, reporting, review test, documentation, recording and auditing or verification.
1. Job scope.
Scope of Plant Inspection other than through the QC Activities implement control and quality assurance through QA Activities of all production equipment that are stationary (Non Rotating Equipments), including preparing permits the use of relevant agencies, both for the unit as well as equipment-operation individually.
Scope of Plant Inspection other than through the QC Activities implement control and quality assurance through QA Activities of all production equipment that are stationary (Non Rotating Equipments), including preparing permits the use of relevant agencies, both for the unit as well as equipment-operation individually.
From my experience as Plant Engineer in several companies, plant-inspection activities include expansion of project activities (expansion), de-bottlenecking, revamping and renovation of the operating units that are under the scope of its responsibilities.
Project activities include QA for engineering, procurement, fabrication, construction and pre-commissioning.
2. QA Activities (Managerial Inspection)
Covers the activities:
2.1 Review of Engineering Documents;
2.2 Vendor List Review;
2.3 Participating in the Pre Bid Meeting;
2.4 Bid Documents Review;
2.5 Attending in Pre-inspecting Meeting;
2.6 Visit Inspection;
2.2 Vendor List Review;
2.3 Participating in the Pre Bid Meeting;
2.4 Bid Documents Review;
2.5 Attending in Pre-inspecting Meeting;
2.6 Visit Inspection;
3. QC Activities
Their activities include such things as follows:
Their activities include such things as follows:
3.1 Receiving Inspection;
3.2 Monitoring in handling Equipments;
3.3 Inspection on Maintaining Works; On & Off Stream Maintenance.
3.2 Monitoring in handling Equipments;
3.3 Inspection on Maintaining Works; On & Off Stream Maintenance.
Indonesian Version.
Kita terlanjur menterjemahkannya sebagai pemeriksaan-pabrik yang pada kenyataannya merupakan suatu gabungan kegiatan-kegiatan baik yang bersifat operasional maupun manajerial, yang meliputi kegiatan survey, data collection, check, measure, detection, examination, analyze, , reporting, review test, documentation, recording dan auditing atau verification.
1. Job scope.
1. Job scope.
Lingkup Plant Inspection selain melaksanakan pengendalian melalui QC Activities dan pemastian mutu melalui QA Activities terhadap semua peralatan produksi yang sifatnya stationer (Non Rotating Equipments), termasuk menyiapkan izin penggunaan dari instansi terkait, baik bagi unit-operasi maupun peralatan secara individual.
Dari pengalaman saya sebagai Plant Engineer di beberapa perusahaan, kegiatan plant-inspection mencakup pula kegiatan proyek perluasan (expansion), debottlenecking, revamping dan renovation dari unit operasi yang berada di bawah scope tanggung-jawabnya.
Kegiatan proyek meliputi QA untuk perekayasaan (engineering), procurement, fabrication, construction dan precommisioning.
2. QA Activities (Managerial Inspection)
Meliputi kegiatan-kegiatan:
2.1 Engineering Documents Review;
2.2 Vendor List Review;
2.3 Participating in Pre Bid Meeting;
2.4 Bid Documents Review;
2.5 Attending in Pre-inspecting Meeting;
2.6 Visit Inspection;
3. QC Activities
Kegiatannya meliputi hal-hal sebagai berikut:
3.1 Receiving Inspection;
3.2 Monitoring in Equipments handling;
3.3 Inspection on Maintaining Works; On Stream Maintenance & Off Stream Maintenance;